Emergency Bridge / Light Mountain Bridge / Mechanized Bridge For Plateau Vehicles

Trade on HiSupplier, Worry Free Guarantee
Trading safety, secure your money, lower the risk, protect both buyers and suppliers
HiSupplier is a Chinese multinational company in U.S, it helps to coordination and order landing.
More ›
  • Product Details
  • Company Profile
  • Product Reviews


Emergency Bridge / Light Mountain Bridge / Mechanized Bridge For Plateau Vehicles


Light Mountain Bridge is mainly used to erect an emergency bridge for all sorts of artilleries and vehicles to get across streams, trenches, ditches, craters or other obstacles not wider than 20.5m.
 

It can be used in plateau (with boost engine and oil adapted), mountain area, plain and paddy field area.

 

Specification for Light Mountain Bridge

 

Folded outline dimension (L*W*H)

10960*3200*3640mm

Gross weight

21.8t

Tracked load / Axle load

22t / 10t

Bridge weight

6.5t

Bridge length

22.5m

Negotiating width (on hard banks)

20.5m

Section length

7.5m

Roadway width

3.2m

Track girder width

1.16m

Erection / Retrieval time 

10/10 mim

Max. twist in erection

±5%

Allowable bank height difference

2.0m

Operator

3 operators

 


Send message to this supplier
Ms. LIU SONGXIA
Tel: 86-27-88395376
Mobile: 86-13797250005
Enter between 20 to 3,000 chatacters.
Contact Method
China Harzone Industry Corp.,Ltd
NO. 5, YANGGUANG AVENUE, MIAOSHAN DEVELOPMENT ZONE,JIANGXIA DISTRICT, Wuhan, Hubei, China (Mainland) / 430000
Fax: 86-27-88395884
Didn't find what you're looking for? Post Buying Lead or contact our customer service specialist for help!
Buyer Help Center